Flagship Project
Project Shearwater
Project Shearwater is HAMR Energy’s fully integrated forestry-to-fuel program, uniting biomass pre-processing at Myamyn in Victoria’s Green Triangle with methanol and jet fuel production at Port Adelaide, South Australia. Together, the two facilities convert 600,000 tonnes of forestry residue and renewable hydrogen into 300,000 tonnes of low-carbon methanol and 140 million litres of sustainable aviation fuel each year, abating approximately 360,000 tonnes of CO₂e.

Location
KEY
Biomass Processing Hub
Biomass pre-processing plant in Myamyn, VIC
SAF Energy Park
Biomass to Methanol plant (BtM) and Methanol to Jet plant (MtJ) in Port Adelaide, SA
Port of Portland and Port of Adelaide
Transport ports betwee BioHub (VIC) and SAF Energy Park (SA)
Biomass transport route
Pathway to transport biomass from BioHub (VIC) to SAF Energy Park (SA)
Green Triangle feedstock area shown shaded. Scale bar 100 km.
Explore the Flagship Projects
Two integrated facilities, one continuous pathway from forestry residue to certified sustainable aviation fuel.